In this episode, the gunite crew from S.A.M. Gunite Pools comes back to shoot our south wall. They had just finished the roof on the Friday before, so the equipment and materials were already in place. The form work was lath covered rigid XPS insulation over steel stud framework. Easy-peasy… Easy to watch anyway.
The Video
The Forms
We started with a steel stud framework and attached 2 inches of XPS rigid insulation (Pink Board) to that. The window bucks were treated wood, cut to match the curve of the wall. We also had some 4 and 6 inch tube steel in the wall to take loads from the earth covered awing that we will add in a later step. Then we covered the XPS with lath to hold the shotcrete and we were ready to go. You can find more details and pics on the formwork here…
This is a pretty easy and robust way to form a wall, and includes built-in continuous insulation already in place from day one. The steel studs also leave a 4 inch deep cavity that I expanded out with some furring strips on the inside so I could fit 5 inches of additional insulation.
The Bat’Lath was used a lot in this job to trim down the walls to the correct thickness before troweling. This did create a fair amount of waste, but I am sure it was worth it compared to trying to push around that much concrete.
The Gallery
A picture is worth a thousand words, but these pics also have captions, so bonus words!
This one is the long awaited shooting of the gunite roof. As per usual, we’ll start with the time lapse video and end with a gallery. If I am up for it, I’ll post some lessons learned in between.
The video
Lessons Learned
Gunite vs Shotcrete: This topic was already covered, but I’ll link to it here. I’ll also add that it is all in the mix. If your gunite is just a basic sand and portland mix, it isn’t going to be as strong as a shotcrete mix with some fancy additives, heavier aggregate, etc.
Lath and Screen vs Hardboard: For the shotcrete, the lath and screen worked well. None of the shotcrete passed thru the screen because it uses a pea stone aggregate. However, the gunite used sand as the aggrigate and did pass thru the screen. The hardboard was great in some ways, but the weather really beat it up and gave it a rippled surface.
Shooting and finishing: Both are important. My shotcrete crew could have done just as good a job as the gunite crew, but they didn’t. For shooting, you want someone who understands what you need to get done and is just putting up what you need. If they are paid by the cubic yard, they may put up more than you need, etc. You definitly want enough finishing people to finish the surfaces adequately. If your crew is strong on shooting, but doesn’t have enough man power to finish, you will be sad.
Cleanup… If the crew treats cleanup as an afterthought, you will be sad. There will be mess. Make sure the crew has enough man power to deal with it. Beyond that, you probably need to keep your eyes open for things the busy crew may miss. For instance, I wish I had better covered some of the near by boulders to prevent them from getting gunite on them and I really wished I had better cleaned off the polished concrete ribs before the gunite set. That mistake cost me many many hours.
Do it yourself? My rule of thumb is that if a job takes tens of thousands of dollars worth of specialized equipment, you probably shouldn’t be doing it yourself. Add the experience, skill and stamina required and I would double down that you probably shouldn’t be doing your own gunite or shotcrete. That said, I do know of some who have and kudos to them.
In preparation for shooting the gunnite on the roof we needed to put up some forms that would keep the concrete from just falling thru. The radial vaults have simple curvature, so we could build the forms from boards pressed up against the steel arches. Making that happen took some compromises in the plan. As usual, challenges arose. Enjoy.
The Video
The Chimney
In the video I forgot to include any footage of the chimney going in. Basically, I built this form so the shotcrete would create a good base for my chimney on the vault. My one regret was that I didn’t think to close the top of the form in order to prevent the gunnite from going inside the chimney hole.
The Gallery
A picture is worth a thousand words and here a bunch of pictures
We started with full panels and planned to but joint them and attach batons over the ends. But it definitely didn’t work. So I just sat and thought about it for a while.
My first panel attempt.
The vault is radial, so simple curvature and a panel should have fit smooth. But I forgot that the outer edge is inset 2 inches from the bar, which means I needed to notch the panel so it would work out.
By the time we finished off the first vault, we had the plan mostly worked out.
Just a pic of progress
Sherri’s brother Steve showed up for a tour.
The second layer tucked in easily. The hardboard fit above the previous hardboard and the wood baton fit under the previous hardboard so it could be screwed into the steel arch. Then additional lath screws would be added from the outside to attach the hardboard to the batons.
Sherri working until past dark…
Here you can see that the playroom vaults don’t have the end caps on yet. I can’t add the panels until after the end caps go on.
Here you can see the insulated south wall. We plan to shoot the whole structure (roof and walls at once).
Sherri put the lath vaults together. Here she is still adding the the rebar chairs and screen. The rebar chairs keep the rebar fully embedded in the concrete. The screen keeps the wet gunite from blowing thru the lath. It isn’t strong enough to actually hold the concrete, the lath does that.
David at the end of the day…
Our friends (Ryan and Aaron) came over to help for a few hours. We needed to put the end caps on the arches, so we started with that.
A pigeon made a nest and we carefully worked around it.
Michael hanging out with me while I was putting the forms up on the last standard sized vault.
Sherri working hard
Here is the pigeon after the vault forms are in place.
Sherri working on the second lath vault.
A standard end of the day pic.
Just a close up pic on a standard vault.
Pigeons make crappy nests. They are very sloppy and the eggs or chicks often fall out. This pigeon had 3 eggs initially. After the second one fell out, I decided to put some tape up to look after the last one.
I double sided the tape so it wouldn’t be sticky against the birds.
My father packing up the tools at the end of a long day.
We usually recycle bill board vinyls to help with waterproofing. They always have an image, this one made me laugh.
The smurf tube (ENT) electrical conduit will allow us to run wires up thru the vaults after the concrete is in place.
This smaller vault had too tight of a radius for the hard board, so we went with lath. I was able to put hardboard on the sides.
Inside of the dining room vaults.
Here is an electrical box mounted on a lath vault.
Why 4 tubes? Well, 2 are for the light and they go to 3 way switches on either side of the room.
The other two are to run power from another switch to another light. We go thru the box because building code limits the number of turns in the pipe between two boxes.
I wouldn’t have been able to add these boxes after vaults were on both sides, so I would add them between adding the vaults. So one vault, then the next electrical box, then the vault on the back side…
After the concrete is in place, I can drill thru the box so wires can access both sides.
Most vaults have one ceiling fixture with a 3 way switch on either side of the room.
We have had a lot of electrical inspections… And we passed this one too.
The hardboard would expand when wet and the stress would cause the screws to pop.
These screws are pretty thick (#14), but the boards were still popping the heads off.
I sited the wood stove template (according to code) on the floor and then setup my laser to pin point where the hole in the ceiling should be.
We built this form as a base for the chimney.
Once we started covering with plastic we would need to pull back the plastic everytime we worked on it.
We often worked past sunset.
A large bird tore this rabbit up and dropped the pieces in the house…
Covering the vaults with plastic was necessary for keeping the water off the vault.